rock slope protection fabric class 8
Check the area to be protected to ensure that the required expansion joints are in place. SLOPING AND BENCHING SYSTEMS - National Institute of Environmental DOCX ppmoe.dot.ca.gov 4 0 obj In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. Refer to Section 4-96, Geosynthetics, of this manual for guidelines on inspecting and accepting rock slope protection fabric. Temporary structures shall be left in place until adequate vegetation and the permanent . If the slope is steeper than 2:1, do not use rounded boulders and cobbles. Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. com routes make excellent running trails for serious runners and casual joggers, alike. 99 (30% off) Best Selling Saucony Flat Mask By mrhzid $8. When specified, ensure coloring is added to the concrete. <> When rock slope protection fabric is required for either method, ensure the contractor places the fabric before placing the rock slope protection. Nonwoven Geotextile Fabrics . Soil Stabilization Matting - Slope Application, Perm. Caltrans New Riprap Classes - Plainwater Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. Rock Slope Protection practice is intended for slopes too unstable for revegetation practices alone. {s9y^ 0000013346 00000 n
Ensure concrete is cured by one of the specified methods. Copies of these details are made available below in both Adobe Portable Document Format (PDF) and AUTOCAD Drawing (DWG) file formats. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. 2019-07-30T13:47:33-04:00 FDM 10-10-3 There are three material gradation requirements based on required rock layer thicknesses. rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) stream AASHTO is typical mass of 4.1 sy/oz.. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. 0000012187 00000 n
<>stream or call Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. Chapter 4: Construction Details, Section 72: Slope Protection The contract will identify the designated method. 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. Inspect the rock to ensure it has been cleaned of any adhering dirt and clay and is moistened before concrete placement. Source: Caltran Highway Design Manual, Chapter 870 1, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. with a minimum of 50% of the stones . Project Details For EA 04-0A0204 ITEM NUMBER 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) Bid Opening Date (mm-dd-yyyy): 04-21-2021 District-County-Route-Postmile: 04-SON-1-R15./R15.7 Quantity: 220 SQYD Unit Price: $21.50 Total Price: Type of work: REALIGN ROADWAY The concrete slope protection method consists of paving the embankment with portland cement concrete. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system > The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. cIP=L
?L-o'OfE;9'WgIBdysw>vOo#g 8L3f*7Mnd*3cdLy&v~;6s8;)9Q"SE8a+3/>svm^}+7Ea8IG01nY5y7mxJ]X9sGjv][ppYdv r=0EVPTO(Xam
-j9 WYY5:F"l9o&l:dyg^0GXoZgm[\H2#RrlXpZd`CAlwE.Sz.BuTiqT;E@m3I~`km&yeF Contact your local TenCate Geosynthetic representative for the proper use and specification of these products. Click on a heading to sort by that heading. Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. Obtain rock samples for acceptance tests. Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. Review Section 4-90, Concrete, of this manual for details about concrete production. The plans indicate the minimum depths of foundations. ITEM 601 SLOPE AND CHANNEL PROTECTION - Pages US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. On a cut slope, this could be due to . Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. 0000011079 00000 n
Mirafi N-Series - TenCate Geosynthetics TAR_%R5Wa%*x4ux-x5d1c
iU:v9b!KXGcFK 1fN2 t K! >> 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). 8 0 obj It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. 0000009975 00000 n
Slope paving is a broader term that covers a variety of methods for paving slopes, including colored slope paving, exposed aggregate slope paving, and slope paving with concrete pavers. 6 0 obj 6'' min. 0000014231 00000 n
PDF Riprap Revetments - Ohio Department of Natural Resources requirements. Mirafi N-Series Product Description Sheet. Testing must follow the frequencies shown in Section 6-1, Sample Types and Frequencies, of this manual. Provide galvanized guide rail cables a minimum 19 mm in diameter, consisting . 0000004037 00000 n
0000015681 00000 n
<>/Font<>>>/Fields[]>> 9 0 obj Order corrective work when necessary. Erosion Control at Lowes.com /Type/ExtGState Hydraulic Design Manual: Embankment Protection - Texas Department of Your search for great running gear starts and ends with us. Use 5 to 7 st California Department of Transportation Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. For details about concrete production, review Section 4-90, Concrete, of this manual. construction contract standards page. FHWA - Center for Local Aid Support - Publications Copies of these details are made available below in both Adobe Portable Document Format(PDF) and AUTOCAD Drawing (DWG) file formats. Nisan 14 2025,
Roller Coaster Derails Caught On Tape,
Spirited Hive Cocktails Calories,
Articles R
Check the area to be protected to ensure that the required expansion joints are in place. SLOPING AND BENCHING SYSTEMS - National Institute of Environmental DOCX ppmoe.dot.ca.gov 4 0 obj In making such a decision, observe the following: Take pictures to document existing conditions and verify that Form CEM-3101, Notice of Materials to Be Used, includes the materials for slope protection. Refer to Section 4-96, Geosynthetics, of this manual for guidelines on inspecting and accepting rock slope protection fabric. Temporary structures shall be left in place until adequate vegetation and the permanent . If the slope is steeper than 2:1, do not use rounded boulders and cobbles. Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. com routes make excellent running trails for serious runners and casual joggers, alike. 99 (30% off) Best Selling Saucony Flat Mask By mrhzid $8. When specified, ensure coloring is added to the concrete. <> When rock slope protection fabric is required for either method, ensure the contractor places the fabric before placing the rock slope protection. Nonwoven Geotextile Fabrics . Soil Stabilization Matting - Slope Application, Perm. Caltrans New Riprap Classes - Plainwater Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. Rock Slope Protection practice is intended for slopes too unstable for revegetation practices alone. {s9y^ 0000013346 00000 n Ensure concrete is cured by one of the specified methods. Copies of these details are made available below in both Adobe Portable Document Format (PDF) and AUTOCAD Drawing (DWG) file formats. Slope protection structures are to be used where concentrated water will cause excessive erosion on existing and/or recent cut and fill slopes. 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. 2019-07-30T13:47:33-04:00 FDM 10-10-3 There are three material gradation requirements based on required rock layer thicknesses. rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) stream AASHTO is typical mass of 4.1 sy/oz.. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. 0000012187 00000 n <>stream or call Place a highly permeable and appro-priately sized geotextile filter fabric on the prepared slope following the manufacturer's recommendations. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . When exposed aggregate slope paving is specified, ensure any concrete set retarders are used in accordance with manufacturer instructions. Chapter 4: Construction Details, Section 72: Slope Protection The contract will identify the designated method. 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. Inspect the rock to ensure it has been cleaned of any adhering dirt and clay and is moistened before concrete placement. Source: Caltran Highway Design Manual, Chapter 870 1, METHOD B) (CY), ROCK SLOPE PROTECTION (NO. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . 2, METHOD B) (TON) (ENGMET), ROCK SLOPE PROTECTION (NO. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. with a minimum of 50% of the stones . Project Details For EA 04-0A0204 ITEM NUMBER 729011 ROCK SLOPE PROTECTION FABRIC (CLASS 8) Bid Opening Date (mm-dd-yyyy): 04-21-2021 District-County-Route-Postmile: 04-SON-1-R15./R15.7 Quantity: 220 SQYD Unit Price: $21.50 Total Price: Type of work: REALIGN ROADWAY The concrete slope protection method consists of paving the embankment with portland cement concrete. For method A placement and the class of RSP described, comply with the rock grading shown in the following table: For method B placement and the class of RSP described, comply with the rock grading shown in the following table: Rock must have the values for the material properties shown in the following table: Select rock so that shapes provide a stable structure for the required section. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system > The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. cIP=L ?L-o'OfE;9'WgIBdysw>vOo#g 8L3f*7Mnd*3cdLy&v~;6s8;)9Q"SE8a+3/>svm^}+7Ea8IG01nY5y7mxJ]X9sGjv][ppYdv r=0EVPTO(Xam -j9 WYY5:F"l9o&l:dyg^0GXoZgm[\H2#RrlXpZd`CAlwE.Sz.BuTiqT;E@m3I~`km&yeF Contact your local TenCate Geosynthetic representative for the proper use and specification of these products. Click on a heading to sort by that heading. Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. Obtain rock samples for acceptance tests. Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. Review Section 4-90, Concrete, of this manual for details about concrete production. The plans indicate the minimum depths of foundations. ITEM 601 SLOPE AND CHANNEL PROTECTION - Pages US 160NW resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. On a cut slope, this could be due to . Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. 0000011079 00000 n Mirafi N-Series - TenCate Geosynthetics TAR_%R5Wa%*x4ux-x5d1c iU:v9b!KXGcFK 1fN2 t K! >> 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). 8 0 obj It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. 0000009975 00000 n Slope paving is a broader term that covers a variety of methods for paving slopes, including colored slope paving, exposed aggregate slope paving, and slope paving with concrete pavers. 6 0 obj 6'' min. 0000014231 00000 n PDF Riprap Revetments - Ohio Department of Natural Resources requirements. Mirafi N-Series Product Description Sheet. Testing must follow the frequencies shown in Section 6-1, Sample Types and Frequencies, of this manual. Provide galvanized guide rail cables a minimum 19 mm in diameter, consisting . 0000004037 00000 n 0000015681 00000 n <>/Font<>>>/Fields[]>> 9 0 obj Order corrective work when necessary. Erosion Control at Lowes.com /Type/ExtGState Hydraulic Design Manual: Embankment Protection - Texas Department of Your search for great running gear starts and ends with us. Use 5 to 7 st California Department of Transportation Slope Protection consists of rock, concrete, or concreted rock or slope paving, ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE, THE PLACEMENT METHODS DESIGNATED BY CALTRANS, ADVANTAGES OF USING RIP RAP OR STONE PROTECTION FROM WILSON QUARRY (AROMAS), Make certain of the Product RequiredProject Service Requirements, Specifying Agency (Caltrans, Green Book, Army Corp or Other), Special Provisions addressing additional specifications, Certification Required (Submittals) Caltrans, Army Corps, other agency or engineer, Quantity Required (Specific GravityConversion Tons to Cubic Yards), Product Availability (Available when required, can handle Daily Shipping Requirements), The Reputation of your Supplier and their Products & Services, 100% Crushed Granite (Provides Superior Stability and Durability), Many different Rip Rap types available:All Caltrans Classes and Sizes, High Daily Production and Shipping Capacity (Can Handle Large & Small Jobs), Graniterock can provide delivery to your jobsite if desired. For details about concrete production, review Section 4-90, Concrete, of this manual. construction contract standards page. FHWA - Center for Local Aid Support - Publications Copies of these details are made available below in both Adobe Portable Document Format(PDF) and AUTOCAD Drawing (DWG) file formats.
Nisan 14 2025,
Roller Coaster Derails Caught On Tape,
Spirited Hive Cocktails Calories,
Articles R